Local guide
Remodeling a kitchen or bathroom in San Diego: permits and California contract rules
A plain-language guide to when the City of San Diego requires a building permit for a remodel, when a kitchen or bath job can use a No-Plan Building Permit, and the California rules on home improvement contracts.
What needs a permit in the City of San Diego
The City of San Diego's Information Bulletin 203 lists common work that does not need a building permit, with the full list in San Diego Municipal Code section 129.0203. It includes like-for-like maintenance repairs with an aggregate value of no more than $1,000 that don't affect electrical, plumbing or mechanical installations. The municipal code adds that painting and decorating, floor covering, cabinet work and outside paving are exempt regardless of value.
Exemptions don't apply to designated historical resources or buildings in a designated historic district, and the work must still meet code even when no permit is needed. The city says a residential addition or remodel with plans needs a building permit, submitted online.
No-Plan Building Permits for kitchens and baths
Information Bulletin 203 lets some work get a building permit without plan review. That includes remodeling an existing kitchen or bathroom in a residential building with no changes to structural elements, wall framing or exterior walls and no added plumbing fixtures, as well as same-size door and window replacement and re-stucco.
The bulletin notes that a historical review may still be required, and that roof replacements are not eligible for a No-Plan Building Permit.
California rules for the contract
The Contractors State License Board (CSLB) says a written contract is required for all home improvement projects over $500. The contract and any changes to it must be in writing, legible and easy to understand, and must tell the homeowner about their right to cancel.
Under Business and Professions Code section 7159.5, a down payment on a home improvement contract may not exceed $1,000 or 10 percent of the contract amount, whichever is less, and apart from the down payment a contractor may not take payment that exceeds the value of the work performed or materials delivered.
Before signing, homeowners can check any contractor's license status on CSLB's free Check a License tool.
Illustration only, not a real project: a San Diego homeowner replaces bathroom tile, the vanity and the tub in the same spots, without moving walls or adding fixtures. That scope fits the No-Plan Building Permit description, and the down payment on the contract should stay within the state limit.